Diary of work performed by the Electricians of the H.K.V.E. during Camp, 1905.
TIME.
DATE.
From
To
SUBJECTS.
1905.
14th Oct., 6.00 p.m.
7.00 p.m. Tracing connection on switchboard.
REMARKS.
1033
15th
6.00
7.00
J
23
Dynamo attendance.
16th
5.30
6.30
སྭ་
43
Incandescent lighting of Defence buildings.
17th
"
10.00 a.m.
17th
5.30 p.m.
7.00
17th
8.00
9.30
.་
11.30 a.m. Tracing E. L. connections, preparing and fitting
brushes to dynamos.
T
Fixing up projectors for working outside No. 19
Emplacement.
Working temporary projector as searchlight, and at
same time Camp lights, all from 19 dynamo, No. 20 engine being out of action. 7.30 a.m. Lecture-Construction of dynamo.
The Camp was il- luminated from Nos. 19 and 20 Engine Room during the whole period, by the Volunteers, equi- valent of 150 16- c.p. lamps were installed.
18th
6.00 a.m.
18th
8.00
9.30
"
Working Nos. 19 and 20 dynamos.
19th
10.00
11.30
21
Installing tents with incandescent lamps.
19th
4.45 p.m.
6.00 p.m. | Lecture-E. L. instruments and tools.
20th
10.00 a.m.
20th
5.30 p.m.
6.30 p.m.
12 No . | Fitting tents with incandescent lights.
Working Nos. 12, 13 and 14 lights.
21st
6.00 a.m.
7.30 a.m.
21st
10.00
11.45
"
"
22nd
10.00
11.30
Working Nos. 19 and 20 lights from No. 20 dynamo.
Tracing cross faults in No. 19 circuits.
Lecture-"Ohms laws to E.L. work.
وو
23rd
6.00
7.30
Lecture Are carbons, reflectors,
??
24th
6.00
7.30
St
24th
6.30 p.m.
5.30 p.m.
6.00 a.m.
Lecture-Reflectors, lenses.
9.00 pm. Manning Nos. 12, 13, 14, 19 and 20 lights.
8.00 a.m.
12 Noon.
7.00 p.m.
8.00 a.m.
12 Noon.
25th
7.00 a.in.
"
25th
10.00
*3
25th
26th
26th
10.00
27
""
26th
*
6.30 p.m.
7.00 p.m.
27th
་་
7.00 a.m.
27th
10.00
13
17
12 Noon.
27th
"
28th
"
28th
*
31st
"
5.30 p.m.
6.00 a.m.
2.30 p.m.
Lecture-Beams, focussing, fixing, and directing.
Finding polarity of dynamos, in changing carbons.
Dismantling and re-fixing a mark III projector.
Visit to and explanation of a service Directing Station
and Telephone Room, R.E. Communications. Connecting up and working No. 19 temporary pro-
jector.
Working Nos. 12, 13, 19 and 20 lights.
8.00 a.m. Lecture-Are Carbons.
Adjustments and working of automatic lamps,
7.00 p.m. Working Nos. 12, 13 and 20 lights.
7.30 a.m. Lecture—Automatic lamps, lenses, and reflectors.
5.30 p.m. | Technical Inspection by O.C. Submarine Mining.