668

THE HONG KONG GOVERNMENT GAZETTE, JUNE 26, 1936.

Item.

for each additional forging, or cast-

ing as the case may be, by the same maker, included in the same order

Fee.

90

15.00

Witnessing tests of solid drawn steel steam pipes, for each 15, or portion of 15, tests of the material made

30.00

for each 30, or portion of 30, pipes tested by hydraulic pressure

30.00

Inspection of wrought iron steam pipes, in- cluding hydraulic tests,-for each 15, or portion of 15, pipes inspected

30.00

Inspection and tests of boiler tubes subject to

external pressure :—

Lapwelded iron tubes and lapwelded or solid drawn steel tubes for which a

stress greater than that allowed for iron is not required,-

for the first 100, or part of 100,

tubes

30.00

for each succeeding 100, or part of

100, tubes

22.50

Lapwelded or solid drawn steel tubes for

which a stress greater than that allowed

for iron is required,

for the first 100, or part of 100,

tubes

45.00

for each succeeding 100, or part of

100, tubes

30.00

Inspection and tests of boiler tubes subject to

internal pressure,-

for each 15 or portion of 15 tested for tensile strength and ductility for each 90 or portion of 90 tubes tested by hydraulic pressure ... Inspection test and stamping of superheater headers for stock,-for each 15 or portion of 15 tubes tested for tensile strength and by bending, in one order .......

30.00

22.50

30.00

for each 50 tubes or portion of 50

tubes stamped in one order

30.00

for each visit beyond two made in

connection with the order

15.00

Inspection of plates after flanging or work-

ing, for each 15, or portion of 15, in- spected at the same time

30.00