NO. OF LOT.
7.
8.
9.
W
259
Buildings near the North Face of Beacon Hill Tunnel.
DESCRIPTION.
Quarters, above Tai Po Road, 10 rooms, with out- houses, French walls, wooden floors, Ruberoid roof,
Quarters, above Tai Po Road, 5 rooms, with out- houses, French walls, wooden floors. Ruberoid roof,
Quarters, above Tai Po Road, consisting of two semi-detached houses, 3 rooms each, with Bathrooms, 2 out-houses, French walls, wooden floors, Ruberoid roof,
APPROXIMATE DIMENSIONS OF BUNGALOW.
UPSET
PRICE.
79'
× 60'
$4,000
80′ 3′′ 33' 8"
$2,000
67
31'
$1,500
10.
Offices, below Tai Po Road, 4 rooms, out-houses, wood and French walls, concrete floors, Ruberoid roof,
72'
32'
$1.000
11.
12.
13.
Quarters at Shaft, 5 rooms, with out-houses, wood and French walls, wooden floors. Kuberoid roof,
Hospital, adjoining tunnel face, 6 rooms, with out-houses, wood and French walls, concrete and wood floors, two stories, Ruberoid roof,
Foremen's quarters, above tunnel face. 3 rooms, with out-houses, word walls, concrete floors, double tiled roof,
Buildings at Thai Po.
65'
10'
$1,500
78'
40'
$2,000
54'
20′
$1.000
14.
Quarters. 4 rooms, with out-houses, brick plinth,
French walls, wooden floors, and tiled roof, ... 54′ 6′′ x 32′
$1,500
15.
Foremen's quarters, two stories. 12 rooms. with out houses, brick plinth, French walls, cement floors, and tiled roof,
58' 6" .. 40' G"
$2,000
16.
Quarters, rooms, with out-houses, brick plinth, French walls, wooden Hoors, and tiled roof,
60'
28
13
$2,000
In addition to the foregoing, the Government are prepared to dispose of the under- mentioned buildings on the following terms:--
1. The buildings to be dismantled and removed by the purchaser within two months after the date of purchase, the sites being left in a clean and tidy
condition.
2. The Purchaser to pay into the Colonial Treasury, within three days of the date of sale, the full amount for which cach building may have been sold.
3. The Purchaser to deposit, along with the purchase money, a sum of $50 in respect of each building, which sum will be returned to him when he has completed the removal of the building to the satisfaction of the Director of Public Works.