100

2097

100

-distance

路桥分界

road/bridge

SK

Zhuhai.

ZHUHAI

HONG KONG

BRIDGE

PROJECT.

P

海至香港跨 海工程

Thekpa

RAM.

Alignment

路线方案示意图

North Line option

Port

roposals

tunnel" option

***

混方熊

Jinxing se

port

Fad

ro

103

15%

bridges

!

QIAO

--ISLAND

Middlk th

option

南级方

South Line option

INVER

LING DI NË

Longxue"

Qiao #

Denglongz

South

island *

waterway,

waterways

Lingding

20K

25K

30號

Black

Point

terminal

Point

Inner #

Waterway th

lumer A

Lingdingt island I

Fanshi

waterway *

1:100,000

(1:10万)

Note: North Line option is the

recommended option 注:1. 纵断面只示意北线

方案(推荐方案);

2. 断面比例尺

经向比例:1:1万

横向比例:1:10万,

bridge

35K

road

40K

45K

beldge

*

Share This Page