C

Introduction

HKG Queries on 1992-93 Outturn

Size, Composition and Cost of Garrison

Operational Units

14

Annex E

Garrison.

Annex A of the 1988 DCA gave the then size of the There were no detailed numbers or costs quoted,

and in any event number of changes have taken place over the past few years. Bearing in mind the pressure for further economies to be made, and bearing in mind that the Garrison scheduled to run down, it is important for have a thorough understanding of the size of the various operational units and the associated costs.

is in any event

HKG to

HKG Queries

2.

each

HKG needs an up to date schedule setting out for Operational Unit its establishment, strength and annual If any Support Units (see Annex F) are tied to the presence of an Operational Unit, this should be indicated.

cost.

3.

A similar schedule, showing the establishment and strength positions as at 31 March 1992, should also be provided to facilitate comparison.

(5342 p.11)

Share This Page