SCHEDULE OF REQUIREMENTS

POST: CONSULATE - GENERAL HONG KONG

SCHEME: NEW OFFICES

DATE: NOVEMBER 1992

SECTION

OFFICER OR

NO

GRADE

FUNCTION

OF

CLASSI- FICATION

NETT

REMARKS

AREA

STAFF

M2

(1)

(2)

(3)

(4)

(5)

(6)

(7)

T

(5)

Print Room

·

(6)

Store

(7)

Spare Office

U/C

18.5

Includes space for reproduction equipment.

U/C

9.0

U/C

18.5

F.

MANAGEMENT

(1)

Head of Section

1

DS5

U/C

18.5

(2)

Deputy Head

1

DS9

U/C

14.0

(3)

Accountant

LEII

U/C

28.0

Includes space for accounts equipment, Safe and 2 additional staff.

(4)

Housing Officer

LEII

U/C

14.0

(5)

Management

3

LEIIIS

U/C

32.5

Includes space for 1 additional staff.

Assistants

(6)

Secretary

1

LEIII

U/C

17.0

Includes space for filing cabinets.

(7)

Mail room

3

1xDS10

U/C

23.0

Locate near to main reception.

2XLEIV

(9)

Messenger

5

LEV

U/C

11.0

(10)

Machine room

U/C

14.0

(11)

Spare/Visitors

U/C

14.0

Adequate for two people.

(12)

CLO

1

LE

U/C

14.0

(13)

Computer System

1

DS9/10

U/C

14.0

Manager

(14)

Drivers

10

LEV

U/C

18.5

Can be located adjacent to Q(9) if latter/secure and part of main building or site.

(15)

TWO

1

DS6/7EQ

U/C

18.5

G.

SECURITY AND MAIN RECEPTION

(1)

Secu rity

Reception/Gate

House

(2)

Telephonist/Typist | 1

LEIV

U/C

18.5

(3)

Receptionist

1

LEIV

U/C

(4)

Main

Reception

Lobby/Waiting

as

HONGKONG.SOR

Se e Locate at site entrance in a position to control Section H vehicle and pedestrian access.

Share with G2

42.0 or

Provide B/R glass counter with 2 speech units and document passing facilities into (4).

Provide airlock access to main offices controlled from (2)/(3). Doors of air lock necessary should interlock to allow only one door to be open at a time. Provide VIP waiting within the G4 space.

Share This Page