5

current

of

replacement cost or costs of the building or buildings орт parts thereof සිදු at t date resumption; it being fully agreed and understood that separate sums shall be certified in respect of any separate addition or improvement to the building or buildings or parts thereof : Provided always

that

(1)

improvement of th building

in the event of the Government having made සු financial contribution of 100% towards the cost of construction, addition to or buildings or parts thereof then no compensation shall be payable in respect

such building buildings or parts thereof resumed.

ри

of

or

(ii) subject to

Government

(i) above that in the event of the having made a financial contribution

cost

the

of less than 100% towards

Of construction, addition to or improvement of the building

parts thereof then

or

buildings

or

there shall be deducted from the sum certified in (b) above, a separate amount in respect of the construction of or any addition to improvement of

building or buildings or parts thereof which shall be calculated according to the equation set out hereunder

the

where

S

X

X

X Z

+

Y

the amount to be deducted from the sum certified in (b) above

X

www

the

financial

the Government

construction,

improvement

contribution made by

towards the cost of addition

to

or

Of

the building

or

buildings or parts thereof resumed

Y

the

sum which in the opinion of the

Director has

by

been reasonably

expended

the Grantee at the material time or times towards the

N

construction,

improvement of

addition

the

to

building

buildings or parts thereof resumed

the sum certified in (b) above.

Parking

spaces

(15)

Spaces

shall

for

be provided within Director

satisfaction Of the

the

lot to the the parking, loading and unloading of motor vehicles to meet the operational requirements of the lot.

Share This Page