5
current
of
replacement cost or costs of the building or buildings орт parts thereof සිදු at t date resumption; it being fully agreed and understood that separate sums shall be certified in respect of any separate addition or improvement to the building or buildings or parts thereof : Provided always
that
(1)
improvement of th building
in the event of the Government having made සු financial contribution of 100% towards the cost of construction, addition to or buildings or parts thereof then no compensation shall be payable in respect
such building buildings or parts thereof resumed.
ри
of
or
(ii) subject to
Government
(i) above that in the event of the having made a financial contribution
cost
the
of less than 100% towards
Of construction, addition to or improvement of the building
parts thereof then
or
buildings
or
there shall be deducted from the sum certified in (b) above, a separate amount in respect of the construction of or any addition to improvement of
building or buildings or parts thereof which shall be calculated according to the equation set out hereunder
the
where
S
X
X
X Z
+
Y
the amount to be deducted from the sum certified in (b) above
X
www
the
financial
the Government
construction,
improvement
contribution made by
towards the cost of addition
to
or
Of
the building
or
buildings or parts thereof resumed
Y
the
sum which in the opinion of the
Director has
by
been reasonably
expended
the Grantee at the material time or times towards the
N
construction,
improvement of
addition
the
to
building
buildings or parts thereof resumed
the sum certified in (b) above.
Parking
spaces
(15)
Spaces
shall
for
be provided within Director
satisfaction Of the
the
lot to the the parking, loading and unloading of motor vehicles to meet the operational requirements of the lot.