Level Eight (HKBC SK 04/009):

8. (a) Switch E1 and E3.

(b)

"L18" adjacent to F13 should be redesignated "12".

Level Nine (HKBC SK 04/010):

9.

(a)

(b)

Interconnecting door between A2 and Al should be located nearer to the corridor as this will be the normal entry/route to Al.

There are various requirement changes to the brief for this level as follows:-

Section A Function

Area

m2

1

Head of Post

32.5

Notes/Remarks

In addition provide wc

facilities.

(c)

PJ587.ADS

1(a)

Deputy

32.5

2

PAS

23.0

2 Staff:

Interconnect

with Al and Al(a). Includes space for VIP waiting.

4

Office

23.0

2 Staff: If

14

Room

8.0

possible, inter-

connect with A3.

200mm minimum concrete walls, roof and floor.

18

19 )

OMIT/DELETE

The requirement changes at (b) a revision of level 9 layouts. changes are:

(i)

above will lead to

Other layout

A7, 8, 12 and 17 should be adjacent to one another: to achieve this A7 and A8 should replace the existing A15 and A16 positions: NB the current positions of A12 and A17 are correct.

Share This Page