Level Eight (HKBC SK 04/009):
8. (a) Switch E1 and E3.
(b)
"L18" adjacent to F13 should be redesignated "12".
Level Nine (HKBC SK 04/010):
9.
(a)
(b)
Interconnecting door between A2 and A1 should be located nearer to the corridor as this will be the normal entry/route to Al.
There are various requirement changes to the brief for this level as follows:-
(c)
PJ587.ADS
Section A Function
Area m2
2
1
Head of Post
32.5
1(a)
Deputy
32.5
2
PAS
23.0
Notes/Remarks
In addition provide wC facilities.
2 Staff:
Interconnect
with Al and Al(a). Includes space for VIP waiting.
4
Office
23.0
2 Staff: If
14
Room
8.0
18
}
OMIT/DELETE
19
possible, inter-
connect with A3.
200mm minimum concrete walls, roof and floor.
The requirement changes at (b) a revision of level 9 layouts. changes are:
(i)
above will lead to
Other layout
A7, 8, 12 and 17 should be adjacent to one another: to achieve this A7 and A8 should replace the existing A15 and A16 positions: NB the current positions of A12 and A17 are correct.