SECURITY
CLASSIFICATION
DRAFT CONTINUATION
DSR 11C (Revised 12/89)
Top Secret
Secret
Confidential
8A and B. MVD, NTCD and Security Dept are
are content
that the main dispositions are right, and design development (and
section management) will cope with these problems.
Restricted understood.
Unclassified
PRIVACY
MARKING
In Confidence
8C and D. Neither of your comments are fully
8E. The Quantity Surveyors see no reason to be more
cautious about TFC than other schemes. The cost plans are all
necessarily tentative: Swires will have the responsibility for
ensuring full cost control.
I
8F. Point taken, but see 7B above.
8G.
I think the multi-purpose hall (not theatre
see below) will be a useful adjunct to the C-G's operations. The
BC will make much more use of it than the Post, and it is only,
say, three minutes walk away.
8H. Design development will cope with under-
provisions, over-provisions and messy layouts.
The Steering Committee added to your list of present inadequacies (particularly in respect of vertical circulation
capacities) but felt that none of their points of criticism was
insoluble at the next stage.
4.
The Committee agreed that the L & O scheme was the
bther in close contention, but that it also had distinct
Stock No. C002B