LIST OF CONSULTANCIES TO COMMENCE IN THE NEXT TWELVE MONTHS
Brief Scope of Consultancy
Airport
1. Major Utilities/Roads
2. Runway/Airfield Tunnels
Expected Commencement Date
|November 1992
Managing Department (Officer In-Charge)
Provisional Airport Authority
November 1992
Provisional Airport Authority
Highways
1. Lantau Fixed Crossing -
September 1992
Consultancy for Contracts 4 (Lantau Approach Roads and Toll Plaza) and 5 (E & M Works)
Highways Department (Mr D S Paterson - 802 1340)
Management
1. North Lantau Expressway - Provision of
Construction Management support services
To be determined
Environ- mental Monitoring
1. Environmental Protection Office (ENPO) - September 1992
Environmental monitoring and audit of West Kowloon Project Area
Water Supplies
1. Pumping and distribution main from NLE
utility service road to Tung Chung Fresh Water Service Reservoir -Detailed Design
December 1992
May 1993
Highways Department
(Mr K C Yeung - 721 6927)
Environmental Protection Department
(Mr M Nash - 835 1131)
Water Supplies Department (Mr S K Fong - 829 4467)
Specialist Engineering
2. North Lantau Water Supply
- Detailed Design for Stage I Phase I
1. Airport at Chek Lap Kok -
To consult on documentation, tendency, procurement, selection & installation of Air Traffic Control Equipment to support the new airport.
2. Airport at Chek Lap Kok -
To consult on documentation, tendency, procurement, selection & installation of Specialist Mechanization Equipment for the proposed Air Mail Centre.
October 1992
WaterSupplies Department (Mr S K Fong - 829 4467)
Civil Aviation Department (Mr Peter Bodiley - 867 4250)
December 1992
Post Master General
(Mr Kingsley Li - 847 1266)
3. Airport at Chek Lap Kok -
January 1993
Terminal Doppler Weather Radar (TDWR) Consultancy
4. Operational Windshear Modelling System
Consultancy
September 1993
Note: Consultancies on the new airport are based on the latest information provided by
the Provisional Airport Authority
Royal Observatory (Mr P Li - 732 9222)
Royal Observatory (Mr P Li - 732 9222)
10