Planning
2. Airport Railway Feasibility Study -
investigation of alignment, station locations and operation of airport railway, and traffic forecast.
March 1990
Acer Consultants
(Far East) Ltd. and Maunsell Consultants Asia Ltd. joint
venture.
Highways Department (Mr V J Mansfield - 369 7520)
HK(UK)/ HK(UK)
March
1991
CE 46/89
FS
$15.6M+ $4.4M
36TR
Environment Protection Department - EA/EIA studies |(Mr W J Farrell - 835 1102)
-
3. Route 3 Design Stage I Preliminary
design for alignment CRA1 and detailed design for Kwai Chung advance work
4. Airport Railway Interface Study
June 1990
Scott Wilson/ Parsons Brinckerhoff/ Haswell/ Wilbur Smith
Highways Department (Mr C K Wong - 702 6792)
|HK(UK)/
HK(USA)/ HK(UK)/
April 1991
CE 55/89
339TH
ID $83.7M
HK(USA)
June 1990 Griener Incorporated
Civil Aviation Department |(Mr G T Oliver - 802 3427)
USA
July 1990
CE 40/90
PAA
FS
$0.9M
5. Lantau Fixed Crossing -
Railway movement joint feasibility study
July 1990
Bridge and Offshore
Highways Department (Mr K S Leung - 802 1315)
JAP
November
1990
CE 26/90
89TH
ID
Engineering
$4.7M
Association, Japan
6. Lantau Fixed Crossing - detailed structural
design of Tsing Ma suspension bridge and outline design of Kap Shui Mun Bridge
1. Study of Industrial and Commercial
Enterprises that need Relocation with the Airport.
August 1990
Highways Department
HK(UK)
Mott MacDonald H.K.
Ltd.
(Mr KS Leung - 802 1315)
June
1991
CE 49/90
89TH
D
$18.4M
September 1990 Shankland Cox Ltd./
Arthur D Little
Planning Department |(Dr E G Pryor - 828 2103)
HK(UK)/ HK(USA)
April
1991
CE 16/90
FS
$4.6M
Cap. Acc Non-Rect.
Item
Management 1. Airport and Related Projects Overall Works |April 1990
Management - Phase I
2. Chek Lap Kok - management assistance
to PAA
International Bechtel
|NAPCO/Works Branch
(Mr A Fung - 829 6780)
USA
January
1992
CE 24/90
1AG
Management
Inc.
$71.75M
10 September 1990
International Bechtel
Provisional Airport Authority (Mr K Owen - 802 3565)
USA
Inc.
9 September 1991 (terminated on
PAA 03/90
PAA
Management $19.4M
30 July 1991)