2. Lantau Fixed Crossing - advance

earthworks for Route 3 Interchange, Contract 3A (Contract No. HY/91/21)

15 January 1992

7 May 1992

to

September 1994

Highways Department

|(Mr J S V Chai - 802 1318)

Leighton Contractors Pty. Limited

Australia

492TH

$584M

3. North Lantau Expressway, Tai Ho Section

(Contract No. HY/91/07) - construction of about 6.6 km of a dual three-lane highway on north Lantau, including site formation for the twin-track airport railway and utility reserve.(incl. watermains)

16 December 1991

1 June 1992

Highways Department

to

(Mr S C H Wan - 721 6540)

6 October 1996

Lantau Expressway Joint Venture

PRC/

491TH

New Zealand/

UK/

$3,502M

PRC/

HK/

| Australia

Site Investigation

1. Route 3 design stage 2, site investigation

(Contract No. HY/91/17)

8 November 1991

|23 December 1991 Highways Department

Lam Geotechnics

HK

339TH

to

(Mr C K Wong - 721 6792)

Ltd

July 1992

$18M

2. Central and Wanchai Reclamation - Phase I

site investigation for Phase I reclamation and marine borrow area (Contract No. UA 2/90)

3. West Kowloon Expressway - Design and

Contract Stage, Site Investigation

November 1991

21 February 1992

to

Territory Development Department

Bachy Soletanche

$20.73M

France

353CL

mid August 1992

(Mr M T Wong - 882 7204)

Works Order issued

in March 1992

|23 March 1992

to

Highways Department

Term Contractor

HK

471TH

August 1992

(Mr A K S de Mel - 573 3658)

Gammon Construction Ltd.

$14M

Water Supplies

4. Airport Railway - Kwai Chung / Tsing Yi Area

Site Investigation (Contract No. C530A)

1. Temporary Water Supply to North Lantau -

Mainlaying from Cheung Sha to Pak Kung Au (Contract No. 24/WSD/90)

11 May 1992

MTRC

Bachy Soletanche

France

MTRC

to

(Mr. C T Fung - 751 2935)

20 September 1992

1 March 1991

6 September 1991

to

Water Supplies Department (Mr P K Pang- 320 5302)

14 August 1992

Chun Wo Construction and Engineering Co. Ltd.

HK

166WF

$6.4M

Share This Page