2. Airport Railway Feasibility Study -

investigation of alignment, station locations and operation of airport railway, and traffic forecast.

March 1990

Acer Consultants

(Far East) Ltd, and Maunsell Consultants Asia Ltd. joint

venture.

Highways Department (Mr V J Mansfield - 369 7520)

HK(UK)/

[HK(UK)

March

1991

CE 46/89

36TR

FS $15.6M+ $4.4M

Environment Protection Department - EA/EIA studies (Mr WJ Farrell - 835 1102)

3. Route 3 - Design Stage I Preliminary

design for alignment CRA1 and detailed design for Kwai Chung advance work

4. Airport Railway Interface Study

June 1990 Scott Wilson/ Parsons

Brinckerhoff/ Haswell/

Wilbur Smith

June 1990

Highways Department (Mr C K Wong - 702 6792)

HK(UK)/ HK(USA)/ HK(UK)/ |HK(USA)

April

1991

CE 55/89

339TH

ID $83.7M

Griener Incorporated

Civil Aviation Department (Mr G T Oliver - 802 3427)

USA

July 1990

CE 40/90

FS

PAA

$0.9M

-

5. Lantau Fixed Crossing -

Railway movement joint feasibility study

July 1990

Highways Department

JAP

Bridge and Offshore

(Mr K S Leung - 721 6540)

November

1990

CE 26/90

89TH

ID

Engineering

$4.7M

Association, Japan

Planning

6. Lantau Fixed Crossing - detailed structural

design of Tsing Ma suspension bridge and outline design of Kap Shui Mun Bridge

1. Study of Industrial and Commercial

Enterprises that need Relocation with the Airport.

August 1990

Highways Department

HK(UK)

Mott MacDonald H.K.

Ltd.

(Mr K S Leung - 721 6540)

June

1991

CE 49/90

89TH

D

$18.4M

HK(UK)/ USA(UK)/ HK/ HK(UK)

April 1991

CE 16/90

FS

$4.6M

Сар. Асс Non-Rect. Item

September 1990 Shankland Cox Ltd./ Arthur D Little/ Survey Research HK/ Chesterton Petty

Management 1. Airport and Related Projects Overall Works|April 1990

Planning Department (Dr E G Pryor - 828 2103)

Management - Phase I

2. Chek Lap Kok - management assistance

to PAA

International Bechtel

|NAPCO/Works Branch

(Mr A Fung - 829 6780)

USA

January 1992

CE 24/90

1AG

Management

Inc.

$71.75M

10 September 1990

International Bechtel Inc.

Provisional Airport Authority (Mr K Owen - 802 3565)

USA

9 September 1991 (terminated on

PAA 03/90 Management $19.4M

PAA

30 July 1991)

Share This Page