CONFIDENTIAL

ENCLOSURE 3 TO D/ACDS (O)/181/34 DATED 24 SEP 92

RP (CENTRE)

LTC92 had been costed on the basis of Withdrawal Plan (OWP).

the 1989 Outline

Recognised that LTC93 would need to take account of the Army's actual drawdown plans, as well as to make provision for the Stronger for Longer option contained in the 1991 OWP.

Two alternative assumptions raised, mutually exclusive of each other but which would expose the additional costs (to LTC) of each.

CONFIDENTIAL

FEW1 (FEW2\MAYHEW.cop\CLS)

Share This Page