1
LIST OF DOCUMENTS MICROFILMED
DEVELOPMENT DIVISION
CIVIL ENGINEERING OFFICE
Drawing No.
Title
(1) Railway Terminus at Hung Hom, Preliminary Works (Buildings)
Size
DE/R 116 K
Site Plan
38" x 27"*
DE/R 125B
Turntable - General Layout
41" x 30"
DE/R 112K
Running Shed Plan, Elevations and Sectione
48° x 30°
(2) Railway Terminus at Hung Hom
DE/R 14-1D
General Layout
DE/R 14-2D
DE/R 14-3C
38" x 27"
38" x 27"
38" x 27"
DE/R 79F
(3) Railway Workshops at Ho Tung Lau
General Layout
48" x 27"
DE/R 83B
Main Shops Floor Plan
1000
38" x 30"
DE/R 84D
Main Shops
S
Elevations
38" x 27"
DE/R 86D
Main Shops
-
Sections and Details
38" x 27"
DE/R 88D
Minor Shops
Floor Plan
27" x 19"
DE/R 91E
DE/R 81F
Minor Shops
·
Elevations and Sections
38" x 27"
Paint Shop
Plans, Elevations and Section
38" x 27"
DE/R 92E
Motor Shop, Lavatory to Substation -- Plan, Mevations
& Sections
27" x 19"
A/32911
Kam
Office Block Floor Plan and Site Plan
40" x 30"
A/32912
Office Block - Roof Plan, Sections & Details
40" x 30"
A/32913
Office Block
Elevations
40" x 30"
!