PROVISIONAL

SCHEDULE OF REQUIREMENTS

POST: CONSULATE - GENERAL

HONG KONG

SCHEME:

NEW OFFICE

DATE:

JULY 1991

NO

OFFICER OR

IN

OF

GRADE

CLASS- IFICA-

NEIT

FUNCTION

STAFF

TION

AREA sq. ft.

NOTI ARUZA

REMARKS

sq. m.

(2)

(3)

(5)

(G)

EXCLUDES SECTION M AND KS ANDKE

EXCLUDES M8, MY ANDKS AND I≤ 6.

詫な

NETT SPACE REQUIREMENTS 105104

ANCILLARY At 60%

TO CATER FOR CORMIDIAS PARTITIONS TOILETS, TEA POINTS, PLANT ROOMS ETC)

63062

GROSS REQUIREMENT 168166 15640 ALLOW 51, FORFUTURL'S

TO THE SING

EXCLUDES

EXPANSION

8405

176574|| 16.4-29

782

Notes

(a)

All occupied offices should have if possible, natural light.

(b) Design layout should ensure that public can only gain access to main offices via controlled air locks.

(c) Provide, if possible, separate staff entrances/Exits which do not entail transmitting public waiting areas.

(d)

Various computer systems exist. But new unix System planned for early 1992.

Trunking and ducting for power and data cables will be required from the computer room to all occupied offices, together with ample power sockets and clean power supply. Power and data cabling to be kept separate. Provision to be made for all desks to have computer equipment.

(0)

Trunking and ducting required for 10, 1A and PA systems.

(F) All outhoused storage to be secure and to have adequate air conditioning and/or heating.

(9) Containing walls above and adjacent to bullet resistant counters should be constructed to the same bullet resistant standard

as the counters.

kh The nett area shown in column 6 is the nett usable area (window sills do not count as usable space).

1) Provide wheelchair access to main offices and waiting areas.

() Provide if possible easily demountable ceiling panels for visual access to the whole of the Confidential/Secure area roof space.

( Designs and plans will need to be cleared at various stages with Security Department, ISD, TSD, PUSD and post. All clearances should be handled through PPU.

(D) This Sor should not be used after December 1991 without clearance from PPU/DED. The Sor should NOT be altered to take account of changes in staff or facilities without formal clearance with the Planning Officer involved.