PROVISIONAL SCHEDULE OF REQUIREMENTS

POST: HONG KLONG

SCHEME: CONSULATG

-

GENERAL: NEW

OFFICES

DATE:

JULY

1991

NO

ECTION

OFFICER OR FUNCTION

OF

STAFF

GRADE

CLASS- IFICA- TION

NETT

AREA sq. ft.

NETR AREA sq./m.

REMARKS

(1)

(2)

(3)

(5)

(6)

(#)

P

BRITISH COUNCEL

(SEP

SEPARATE ENTRANCE)

MAIN OFFICES

1

DIRECTOR

ASLEQ 4/C

u/c

250

2

PA

LEM

u/c

150

INTERCONNECT WITH (1)

SPACE FOR 2 DOOR CABINET,

·

INCLUDES

PC AND PRINTE/

3 DEPUTY DIRECTOR

DSSEQ

u/c

200

AST EQ

4/C

150

4

OFFICER

GENERAL OFFICE

.4/c

TOTAL

RECEPTIONIST

of

TELEPHONIST

70 LE

LIBRARIAN

STAFF

WAITING ROOM

LIBRARY

REGISTRY

MACHINE ROOM

и/с

120

TO ACCOMMODATE PHOTOCOPIER,

SHREDDEN ET

COMMUNICATIONS

LETTT

4/2

250

:COMPUTER ROOM

и/с

150

TELEX FOR INCLUDES

SPACE AND ONE ADDITIONAL STAFF PROVIDE 24 Hours A/C

FAX

STORE AGE

CONFERENCE NOM

u/c

600

PROVIDE

TABLE AND SEAT ING FOR

CLASS AND STAFF Root

OF

X CLASSROOMS

8th EACH

TO TEACHGI

LECTURER'S REST

кооп

MINIMUM

Of EACH CLASS ROory

TO BE -- ft x -- BEX BE HIGH. PROVIDE

вех

SLIDING DOORS BETWEEN 2×2 SETS DE CLASS Rooms IN ORDER TO INCREASE SIZE OF TWO AREAS FOR FUTURE FLEXIBILITY.

MISCELLANEOUS

/TEA

KITCHEN

MAKING FACILITIES

STAFF. TOILETS

PUBLIC TOILET

LCLOAKROOM

FACILITIES

(Fort

TO CATER STAFF IN MAIN OFFICES AND LECTURER'S REST ROOM.

"

TO CATGA

་་

FOR VISITORS

TO WAITING

ROOM, LIBRARY AND CLASSROOMS.

Share This Page