(c) Roads (Works, Use & Compensation) Ordinance - Gazette entry

Project

Anticipated Date

Highways

1. North Lantau Expressway Phase I

(East of Tai Ho)

1 February 1991

Highways

2. Route 3 CRAI ~ Kwai Chung and

Tsing Yi Sector

3. Sham Wat to Sha Lo Wan Road,

North Lantau

March 1991

April 1991

Managing Department/ Officer In-charge

Highways Department (Mr Y K Ma - 721 6345)

Highways Department (Mr Y K Ma - 721 6345)

Highways Department (Mr Y K Ma- 721 6345)

(d) PWSC submissions for upgrading to Cat. A or change in scope/estimates

Project

1. Lantau Fixed Crossing

include an Item for design of Route 3 Interchange Lantau Approach Road and Traffic, Control & Surveillance system

2. Lantau Fixed Crossing -

advanced earthwork for Route 3

Interchange

Anticipated Date

Managing Department/ Officer In-charge

February 1991

Transport Branch (Mr H Beaton

-

867 4352)

March 1991

Port

1.

Container Terminal No. 8

-

early February 1991

engineering works for back up area and infrastructure

Transport Branch

(Mr H Beaton – 867 4352)

Territory Development Department

|Mr WB Chui – 848 2928)

Share This Page