FORECAST OF SIGNIFICANT EVENTS FOR PADS PROJECTS IN THE NEXT THREE MONTHS
(a) Gazetting of Significant Land Resumption under the Crown Lands Ordinance
3 March 1991
Project
Anticipated Date
Managing Department/ Officer In-charge
Civil
Engineering
1.
Tung Chung Development, Phase 1, Engineering Works
May/June 1991
Territory Development Department
(Mr W B Chui – 848 2928)
Highways 1. Lantau Fixed Crossing - advanced
June 1991
earthwork for Route 3 Interchange at NW Tsing Yi
Transport Branch
(Mr H Beaton - 867 4352)
Airport
for works site and haul road
(b) Foreshore and Seabed (Reclamation) Ordinance - First Gazette entry
Project
1. For the additional area (additional to
that previously gazetted on 9.2.90) required to have a 1523m runway separation for the New
Airport. (previous gazetted area was
based on runways separation of 1350m)
Anticipated Date
Managing Department/ Officer In-charge
15 March 1991
Civil Engineering Services
Department/PAA (Mr
WC Chow - 802 3404)
Civil
Engineering
1.
Proposed land grant to Yiu
Lian Shipyard Ltd. Tsing Chau
Wan, North Lantau.
2. Marine Borrow Area East Brothers
(reserve for airport project)
late March 1991
mid March 1991
3. Marine Borrow Area - East Lamma
(a possibility for airport projects)
end March 1991
4. Tung Chung Development, Phase 1,
engineering works
May/June 1991
Buildings and Lands Dept., NT Office (Mr R C Baram · 402 1611)
Civil Engineering Services Dept. (Mr S R Rasanayagam - 721 3504)
[Civil Engineering Services
Dept. (Mr SR Rasanayagam -- 721 3504)
Territory Development Department
(Mr W B Chui - 848 2928)
Highways
1. North Tsing Yi -
Ngau Kok Wan reclamation
2. Reclamation and association works for
site formation at Chok Ko Wan - for works area for Lantau Fixed Crossing
3. Airport Railway -
Proposed Railway Depot, Tai Ho Wan, North Lantau
8 March 1991
15 March 1991
May 1991
Transport Branch
(Mr H Beaton - 867 4352)
Transport Branch
(Mr H Beaton - 867 4352)
Highways Department (Mr Y K Ma- 721 6345)
Page 225Page 226