Highways

NEW AIRPORT AND RELATED PROJECTS LIST OF CONSULTANCIES UNDER WAY

1 September 1991

Brief Scope of Consultancy

7. Replacement Airport at Chek Lap Kok:

Investigation - Structural geology study for PADS a study on the Seismotectonics and crustal structures pertinent to Hong Kong

1. North Lantau Expressway - detailed

design and construction supervision of highway, railway and utility reserve formations.

2. West Kowloon Expressway

investigation, design and construction supervision.

3. Lantau Fixed Crossing - independent design check of Tsing Ma suspension bridge.

4. North Lantau Expressway - detailed

design of watermains in utility reserve

5. Lantau Fixed Crossing - preparation of

tender document for Contracts 1 & 2 and completion of detailed design of Tsing Ma Bridge(other than structural )

Commencement Date/ Main Consultants

Managing Department (Officer In-Charge)

10 March 1991

Civil Engineering Services

|British Geological Survey |Department (Mr M S Leung -

368 9768)

Agreement

Nationality Completion | Agreement No./

(Origin)

UK

Funding Source/

Date Type/Fees($M)

PWP No.

10.10.91

CE 29/82(ext) 2016AA

FS $IM

July 1990

Mott MacDonald H.K. Ltd.

Highways Department (Mr K W Yau - 724 5373)

|HK(UK)

7.97

CE 18/81

DC $92.2M

[468TH &

451TH

September 1990 Freeman Fox and Maunsell Consultants |Asia joint venture

November 1990 Flint and Neill Partnership

February 1991

Highways Department

(Mr J M Turner - 573 3885)

HK(UK)/ HK(UK)

1996

CE 29/90

471TH/

IDC

457TH/

$76.5M

332CL

Highways Department |(Mr K S Leung - 721 6540)

UK

9.91

CE 50/90 D Check $7.6M

89TH

Mott MacDonald H.K. Ltd.

Highways Department (Mr K W Yau - 724 5373)

HK(UK)

11.92

CE 18/81

173WF

DC $4.6M

April 1991

Mott MacDonald H.K. Ltd.

Highways Department (Mr K S Leung – 721 6540)

HK(UK)

10.91

CE 11/78

D $15M

89TH

Share This Page