December

N/A

1991

FS

$6M

5.

Siu Lam Development Study (To plan a

preferred scheme for the proposed

typhoon shelter and anchorage in Siu

Lam).

May 1991

Territory Development

to

Department/Tuen Mun

December 1991

Development Office

|(Mr W L Wong - 451 3237)

16.

Ma Wan Channel Improvement - Design

July 1991

to

June 1992

Civil Engineering Services Department/Port Works

(Mr K K Chan - 368 5985)

December

N/A

1991

IDC

$25M

7.

Detailed design of Deep Waterfront

August 1991

Industry in Area 38 (Detailed design

to

of reclamation and associated works).

July 1992

Territory Development Department/Tuen Mun Development Office

(Mr W L Wong - 451 3237)

July 1992

N/A

DC

$35M

Share This Page