Highways

*

(001 15del:0 8

NEW AIRPORT AND RELATED PROJECTS.

8 October 1990

LIST OF CONSULTANCIES ENVISAGED TO START IN NEXT TWELVE MONTH

Brief Scope of Consultancy.

1. Lung Cheung Road and Ching Cheung Road Improvements investigation, design and construction supervision

2. Route 3 Country Park Sector

between Ting Kau and Au Tau --

preliminary design and

preparation of bid package.

3. Central Kowloon Route

Expected

Managing Department

Commencement Date (Officer In-Charge)

October 1990

Highways Department

|(Mr J M Turner - 573 3885)

January 1991

Environmental Protection Department -EA/EIA studies only

(Mr W J Farrell - 835 1102)

Highways Department

(Mr H S Kwong - 733 2508)

January/February

Feasibility Study

1991

4. Green Island Link Feasibility

Study

February 1991

M)

5. Route 3Tsing Yi Sector

between Lai Chi Kok and Ting Kau - detailed design

6. Route 16 Feasibility Study

May 1991 (if it

were decided not to

privatize this sector.)

June 1991

(May be advanced to October 90)

Highways Department

(Mr J M Turner - 573 3885)

Highways Department

(Mr J M Turner - 573 3885) Environmental Protection Department

– EA/EIA studies only (Mr W J Farrell - 835 1102)

Highways Department

(Mr H S Kwong - 733 2508)

Highways Department

|(Mr H S Kwong - 733 2508)

Share This Page