SC 16
Ceaira, and Wanchai Reciamanou - Phase i -
reclamation of zoom 40 za and construcica of
around 1.11Û metres of ser svilu, borseOCE
Rumsey Street and Tamas to provide lana for
the expansion of the Central Business Area and
the Airport Radway Terminus as well as conrrucion of replacement forry piers and ai?
conditioning intake faculties.
‚Apru 1991
¡Terntory Development
Department
|(Mr K Austin -'848 2668)
Highways (1.
-
Route 3 Sector between Kwai Chung and Lai Ci Kok construction of approx. 4 km Of A dusi 4-iane highways on clevated ESCIUTOS.
¡May 1991
Augur 1991
November 1991
March 1991
Projocu
3.
Kono Jouau Expressway, Tu Ho Secuen -
Connracion of abow 6 km of a cusi three-isne
highways on north Lanuu, lociuding ste formauon for the two-track airport railway.
North Lamau Expressany, Yam © Socuon confructica of about 4 km of a dumi three-ians
bighways on north Lamau, including site formauon for the ima¬rack airport milway.
Privatimation (1. Rowe 3 Sector betwesa Kwau Chung and Ting
Kau - posable and pacxage for financing, designing, construcung andi operation of about 6 km of dual-three lane roads on a cable stayed lagh level bridge, elevated mructures, bored Tunneis, and a medium level bridge.
!
2. Western Harbour Crossing - bid package for
financing, designing, construcung and operation of
■ 1.5 km tunnel crossing of the Vidona. Harbour berwoca West Kowicea rad Sai Ying Fun. The
tunnel may accommodate a dual three-lans. Tho
tunnel may socommodate a dual three-lane road and
possibly miso a twin-track ruilway.
Silo
Investigation
April 1991
i
Highways Department {(Mr H S Kwong – 733 2503
Highways Department
(Mr KS Leung - 721 6540
Highways Department
(Mr KS Leung - 721 6540
Highways Departmen
(Mr H S Kwong - 733 2508
Highways Departmen
{{Mr J M Tumer – $73 3885
1.
Rowe 3 - nie invosugauon for road aligrocut (CRA] rowe) between Ting Kau and Sham Shui Po.
September 1990
2.
North Lantau Expressway - sito invesugauon for September 1990 new alignment.
3. Central and Wanchai Reclamation - Phase 1 - site October 1990
invesugation for Phase I reclamauon and mareins
borrow area,
14. Roule 3
-
site investigation for highways
between Tai Lam Country Park and Au Tau.
February 1991
Highways Department
|(Mr H S Kwong - 733 2508)
Highways Department (Mr K S Laung- 721 6540
Territory Development ¡Department
(Mr K Austin – 848 2668)
Highways Department (Mr H S Kwong - 733 2508)