PORT PROJECTS
LIST OF CONSULTANCIES UNDER WAY AT NOVEMBER 1990
November 1990
Port
1.
Brief Scope of Consultancy
Container terminal No. 8 site investigation
and Engineering Study (To study the relative merits of locating the next container terminal at either Tsing Yi or Stonecutters Island; and to proceed with the preliminary design of the chosen option to facilitate gazette action and preparation of lease conditions).
2. Ma Wan Channel Improvement Study
3. Expanded Development Study of Tuen
Wan Area 38 (To plan three development scenarios for the proposed special industries and river trade terminal in
Area 38, Tuen Mun).
4. Reprovisioning of Cheung Sha Wan
Shipyards in Siu Lam (To plan and prepare preliminary design for a preferred scheme for the proposed shipyards at Tai Lam Kok, Siu Lam for reprovisioning of Cheung Sha Wan Shipyards in the Preliminary Report Stage).
5. South-east Tsing Yi Port Development - Planning and Engineering Feasibility
Study (to determine the best
configuration and development option for port development at South-east Tsing Yi and to proceed with preliminary design of the recommended option to enable the preparation of gazette plans
and lease conditione)
Commencement Dats/
Main Consultants
Managing Department
Officer In-charge
April 1989
Maunsell-Scott Wilson Department/Tsuen Wan
Territory Development
Kirkpatrick
|Development Office
(Mr B H Coultous – 402 1504)
August 1989 |Mott MacDonald
November 1989 Scott Wilson Kirkpatrick Shankland Cox
ERL (Asia) Ltd.
June 1990
Scott Wilson Kirkpatrick
June 1990
Maunsell-Scott Kirkpatrick
|Civil Engineering Services
Department/Port Works (Mr K K Chan - 368 5985)
|Territory Development Department/Tuen Mun Development Office
(Mr W L Wong - 451 3237)
Territory Development Department/Tuen Mun Development Office
(Mr W L Wong - 451 3237)
Territory Development Department/Tsuen Wan Development Office (Mr B H Coultous
402 1504)
ENT
II. BOKA
bb:AT /. -IT Ø6.
ун
APA