BRIEF SCOPE OF CONSULTANCY

HIGHWAYS (cont'd)

4. Western Harbour Crossing

feasibility study

5.

Route 16

feasibility study

6.

Green Island Link

preliminary feasibility study.

7.

Central Kowloon Route

8.

-

feasibility study

Lung Cheung Road and Ching Cheung Road improvements

-

feasibility study, investigations and design

EXPECTED COMMENCEMENT DATE

Consultant appointed November 1989

Acer Consultnats (Far East) Ltd. Maunsell Consultants Asia Ltd Parsons Brinckerhoff (Asia) Ltd Pypun-Howard Humphreys Ltd. The MVA Consultancy

June 1991

May be advanced to September 1990

September 1990

September 1990

August 1990

MANAGING DEPARTMENT OFFICER IN-CHARGE

Highways Department

(Mr J. M. Turner - 573 3885)

Highways Department

(Mr H. S. Kwong - 733 2508)

Highways Department

(Mr J. M. Turner 573 3885)

Environmental Protection Department

EA/EIA Studies

(Mr G. D. E. Sanvicens - 835 1102)

Highways Department

(Mr J. M. Turner 573 3885)

A

Environmental Protection Department

EA/EIA Studies

(Mr G. D. E. Sanvicens 835 1102)

Highways Department

(Mr J. M. Turner - 573 3885)

Environmental Protection Department

- E/EIA Studies

(Mr G. D. E. Sanvicens - 835 1102)

APPENDIX 1

Share This Page