--་

TO ZHU KAI

SZ

1000 2

ཚ 5 #

HAU

HOI WAN

(Deep

Bay/

URUSION ROAD

SCM

+

Tr

00

ROOF TRE

AIRPORT

0.5

05

YO CHA

90

MTR STATION,

FROUTE 3(X)

TSUEN WAN BYPASS

MTR

EXTENSI

STATION

ちょ

INNER HARBOUR

POSSIBLE RECLAMATION AREA

SCALE 1: 100 000

kad...

POSSIBLE ALTERNATIVE

LEGEND

Promet

PROPOSED ROAD & RAILWAY (PHASE 1)-

PROPOSED ROAD & RAILWAY (PHASE 2}

PROPOSED RAILWAY

ROAD

TUNNEL

PADS PROPOSAL

MA SHE CHAIR.

TOLO HARBOUR

15

DOWNTOWN

AIR TERMINAL

KER HUNG TERMINAL

POSSIBLE KCR EXTENSION

HONG.

PLAN NO. 4

SUBSCARY OF HOPPWEL HOLDINGS LTB

灣與工程有限公司

SLIPFORM ENGINEERING LTD.

Share This Page