}

Line which is already congested.

iii. Increases road congestion in the Kwai Chung and

Tsuen Wan central areas.

iv.

v.

Increases the commuter trip length from Kowloon

to Lantau as against the PADS projects.

of

the

It does not provide for distribution

Western Harbour Crossing traffic in the Kowloon

area. The Argyle St. connection will not be

satisfactory as the street is operating over

capacity now and it would be difficult, if not

impossible, to

corridor.

provide

expansion in that

vi. The East Kowloon MTR Line with its connection to

the KCR will not divert sufficient patronage from

the MTR Nathan Rd. corridor to satisfy long term

demand. A parallel north-south MTR line would be

required in the future.

vii. The traffic

service to the NWNT and a road

connection to the border by way of Tuen Mun

results in a doubling of the trip length from

Sham Tseng to Lok Ma Chau compared with the

planned Route Three Country Park segment.

Share This Page