8.

Lung Cheung Road

9.

10.

and Ching Cheung

Road improvements

feasibility study,

investigations and

design

Boundary Street

West flyovers

August 1990

To be announced

investigations and

design

Route 3 Tsing Yi Sector between Lai Chi Kok and Ting Kau

design Stage 1 (preliminary design

+ some detailed design) for advanced works

design Stage 2

(detailed design)

Process of

appointment of consultants

under

finalization."

Consultants to be appointed in May 91 if it were decided not to

privatize this sector

Highways Department

(Mr J.M. Turner

573 3885)

Environmental Protection Department EA/EIA

Studies

Bwd

(Mr G.D.E. Sanvicens 835 1102)

Highways Department

(Mr J.M. Turner

573 3885)

Environmental Protection Deparment - EA/EIA Studies

(Mr G.D.E. Sanvicens 835 1102)

Highways Department

(Mr H.S. Kwong- 733 2508)

Highways Department

(Mr H.S. Kwong 733 2508)

Share This Page