8.
Lung Cheung Road
9.
10.
and Ching Cheung
Road improvements
feasibility study,
investigations and
design
Boundary Street
West flyovers
August 1990
To be announced
investigations and
design
Route 3 Tsing Yi Sector between Lai Chi Kok and Ting Kau
design Stage 1 (preliminary design
+ some detailed design) for advanced works
design Stage 2
(detailed design)
Process of
appointment of consultants
under
finalization."
Consultants to be appointed in May 91 if it were decided not to
privatize this sector
Highways Department
(Mr J.M. Turner
573 3885)
Environmental Protection Department EA/EIA
Studies
Bwd
(Mr G.D.E. Sanvicens 835 1102)
Highways Department
(Mr J.M. Turner
573 3885)
Environmental Protection Deparment - EA/EIA Studies
(Mr G.D.E. Sanvicens 835 1102)
Highways Department
(Mr H.S. Kwong- 733 2508)
Highways Department
(Mr H.S. Kwong 733 2508)