(2) Notional cost of intramural support to weapons staff.

(3) Extramural design work on the ship (cost included in

shipbuilder contract price at a. above).

Overseeing

The oversight of the production of vessels and equipment excluding

certain propriety items such as the Oto Melara Gun and its Depot Test

Equipment. The overseeing cost is calculated on the basis of 21% of

the value of those items to which it is applied.

g.

Transport Costs

Comprising:

(1) Delivery of Ministry of Defence cupplied items to UK

Shipbuilder, calculated at 1% of the value of those items.

(2) Delivery of gun and depot test equipment, based on

actual costs.

(3) Transit of each vessel from UK to Hong Kong based on

actual costs.

Trials Cost

Cost of essential trials programme additional to C(7) above

conducted by Ministry of Defence (Navy) after acceptance of a vessel

from Shipbuilder.