Generic

Subsystem

Test #.

410

Structure

5.

Test

Exhibit C

TBS

TBS

TBS

Solar Drum Positioner

Deployment Verification

Alignment Checks

Critical Clearances

Grounding Checks, Conductivities

In-Orbit Performance Verification Tests

Hughes shall perform the following in-orbit performance verification tests to establish the in-orbit performance of the spacecraft. Hughes shall perform such in-orbit testing using facilities and test equipment furnished by AsiaSat.

Test

Trans-

ponders TWTAS

Receivers

Drift On- Orbit Station

X

Stationkeeping

Gain transfer and SFD

24

30

4

X

Swept frequency

response

Spurious outputs

EIRP

2223

24

30

4

24

30

4

XX

X

24

30

4

Battery system checkout

Antenna Pointing

Solar drum balance

Command functional

Pilot despin

Backup despin

Telemetry functional

G/T

X

X

X *

X *

X *

selected channels

44

XXX

X

XXXXX

*

Can be accomplished in either drift orbit or on-station.

C-6

Page 195Page 196

Share This Page