8.9

measured using Command Upconverter 2 and HPA 1 at the DISH antenna command frequency and HPA 2 at the OMNI antenna command frequency.

The antenna gain and feed losses, known from the feed used factory acceptance test and analysis will be along with the measured HPA power to calculate the EIRP. All power measurements will be made through the transmit couplers.

status and Control

8.9.1 Computer Substitution Test

The ability to substitute the spare realtime computer for

via another

patching will

demonstrated during

acceptance tests.

be

8.9.2 Orbital Operations Computer Substitution Test

9.0

9.1

9.2

site

The ability to bring the backup Orbital Operations computer up

on on-line

Computer will Operations

as

Orbital

demonstrated during site acceptance tests.

QUALITY ASSURANCE

be

well

In order to ensue that the SCF system for AsiaSat meets all

requirements, is performance

and maintainable, documented, provisions will be made in the implementation

to apply quality program

as controls

part of engineering activity. These quality assurance provisions fall into categories listed below.

Management Controls

the

The establishment of a dedicated program office with the requisite engineering and support skills will provide the basis for assuring a quality product. The overlaying of this structure with senior management support and review on

work will enhance the regular basis will

of the Program Office. A Critical Design Review will provide a basis for assuring the development of a quality product that meets the specification.

a

Design and Manufacturing Controls

The design of the system and each subsystem will be rigorously reviewed within the project team using

using the specification as the vehicle. Specification reviews will be held periodically to ensure design compliance. Careful attention will be paid to the use of proven designs and to the specification of interfaces. Quality assurance requirements consistent with commercial practices for all hardware and software developed by the Contractor or Subcontractors will adhere to the specifications. This will encompass not only design, but manufacturing and parts

28