1.5

i

2.0

2.1

3.0

operating software

a

least over at

five (5) year period from the "site acceptance." The start of SCF operations is considered to be arrival on station of the first satellite. Consideration shall also be given to the upward software compatibility

of

the

generation of equipment to next-generation equipment

computer

ensure

a

manufacturer's

next

smooth transition of into the SCF system as the

original equipment becomes obsolete.

Standards

i) All SCF equipment supplied by the Contractor shall

comply with

ii)

iii)

standards contained

IEE

the in publication "Electrical Installations (15th Edition,

current to

date

the

with

amendments

contract)";

effective

of

the performance of the SCF earth station shall comply with licensing requirements of WARC;

all equipment control panels and final operation and maintenance documentation shall be in the English language.

SCF SITE FACILITIES

General

The facilities to be supplied by Buyer, are defined in the Contract article 7.0.

OPERATIONS CONTROL CENTRE (OCC)

one

The OCC as part of the Satellite Control Facility shall be capable

in-orbit of monitoring and controlling

(1) satellite with software capabilities which permit expansion to accommodate a second satellite and a backup TT&C Earth Station. The OCC shall be provided with the equipment required to allow the operator to:

i)

send commands to the satellite

monitor telemetry data from the satellite;

control the configuration satellite bus and payload subsystems;

ii)

iii)

monitor and

iv)

perform ranging

satellite

v)

of all

and

tracking operations

on

the

monitor and control all required attitude and orbit station-keeping operations.

As a minimum, the Contractor shall provide an operations console, telemetry displays and command keyboard/CRT terminals.

- 2 -

Share This Page