3.
DOCUMENTATION
Documentation will be submitted to the Client according Time is to the schedule shown in the following table.
indicated. Specific shown in months unless otherwise submission dates will be agreed and specified by Parties on a case-by-case basis in advance.
both
ITEM
Requirements for delivery of the Spacecraft and its support equipment to Xichang
DATE
L -
11
Technical Description of
the Separation System
L
11
The Standard Launch Trajectory
L-
and its Select Scope
11
Interface Control Document
L
-
11
Preliminary Mission Analysis Document
Final Mission Analysis Document
Combined Operation Plan and Procedures
Launch Requirement Document
L - 11
L
6
L - 9
L
-
5
Launch Order
L.
Payload Injection Data Report
!
Launch Mission Evaluation Report
L
4
Separation + 30 min.
L+ 3 (normal flight)
Quick look mission data (abnormal flight):
L+1 (week)
ANNEX II
10