3.

DOCUMENTATION

Documentation will be submitted to the Client according Time is to the schedule shown in the following table.

indicated. Specific shown in months unless otherwise submission dates will be agreed and specified by Parties on a case-by-case basis in advance.

both

ITEM

Requirements for delivery of the Spacecraft and its support equipment to Xichang

DATE

L -

11

Technical Description of

the Separation System

L

11

The Standard Launch Trajectory

L-

and its Select Scope

11

Interface Control Document

L

-

11

Preliminary Mission Analysis Document

Final Mission Analysis Document

Combined Operation Plan and Procedures

Launch Requirement Document

L - 11

L

6

L - 9

L

-

5

Launch Order

L.

Payload Injection Data Report

!

Launch Mission Evaluation Report

L

4

Separation + 30 min.

L+ 3 (normal flight)

Quick look mission data (abnormal flight):

L+1 (week)

ANNEX II

10

B&