ANNEX II

50% + 5% respectively.

Launch operation services

during the launch day

and launch campaign as stipulated in the contract.

the

- The regular work-week contains six work-days at launch centre, two shifts a day and 8 hours per shift.

1.5.3 Storage of the user's support equipment and com- the solid ponents of spacecraft including storage of motor, pyrotechnics and the refrigeration storage for storage, of Temperature

refrigerated batteries. batteries shall be between -25 deg.C and -5 deg.C.

1.5.4 Transportation

of

for

components spacecraft,

support equipment between working places.

and

1.5.5

Spacecraft weighing.

1.5.6

Technical services.

photographic

and video recording

NOTE:

1.5.7

licence restric- Because of possible export

to tions it may be necessary for the Client

video supply and control photographic and

assist the Client in services. CGWIC will

and implementing procedures for photographic

any such that comply with operations

video

restrictions.

Supply of working clothes used for clean and hazardous operations.

rooms

1.5.8 Radio frequency links between BS2 building

checkout locations, including a link spacecraft the launch pad to the location of the Spacecraft port equipment after mating of the Spacecraft with Launch Vehicle.

and

from

sup-

the

1.5.9 Supply of a xerox machine with 50,000 pieces of duplicating paper.

1.5.10 Supply of national and international telecommu- telephones, facsimile nications facilities including

terminals, telex terminals and leased circuits will be for the Client's account.

1.5.11 Calibration services for calibration for general instruments.

1.5.12 Personnel support for

which

services

installing and trans-

porting the spacecraft and its support equipment.

1.5.13 Supply of offices and associated office equip- ment for the user's personnel (no more than 40 persons).