ANNEX II
50% + 5% respectively.
Launch operation services
during the launch day
and launch campaign as stipulated in the contract.
the
- The regular work-week contains six work-days at launch centre, two shifts a day and 8 hours per shift.
1.5.3 Storage of the user's support equipment and com- the solid ponents of spacecraft including storage of motor, pyrotechnics and the refrigeration storage for storage, of Temperature
refrigerated batteries. batteries shall be between -25 deg.C and -5 deg.C.
1.5.4 Transportation
of
for
components spacecraft,
support equipment between working places.
and
1.5.5
Spacecraft weighing.
1.5.6
Technical services.
photographic
and video recording
NOTE:
1.5.7
licence restric- Because of possible export
to tions it may be necessary for the Client
video supply and control photographic and
assist the Client in services. CGWIC will
and implementing procedures for photographic
any such that comply with operations
video
restrictions.
Supply of working clothes used for clean and hazardous operations.
rooms
1.5.8 Radio frequency links between BS2 building
checkout locations, including a link spacecraft the launch pad to the location of the Spacecraft port equipment after mating of the Spacecraft with Launch Vehicle.
and
from
sup-
the
1.5.9 Supply of a xerox machine with 50,000 pieces of duplicating paper.
1.5.10 Supply of national and international telecommu- telephones, facsimile nications facilities including
terminals, telex terminals and leased circuits will be for the Client's account.
1.5.11 Calibration services for calibration for general instruments.
1.5.12 Personnel support for
which
services
installing and trans-
porting the spacecraft and its support equipment.
1.5.13 Supply of offices and associated office equip- ment for the user's personnel (no more than 40 persons).