CONFIDENTIAL
31
30%
removal of exemptions and the allowance of a
increase in discharge over and above the
discharged at the time the controls
a mount
in
a particular WCZ are implemented;
a
new requirement
within
a specified
that
existing
premises
distance
of a new or
existing public f ou 1 sew er will be obliged
to connect discharges into it;
a
new requirement that the design and
construction
sewage
and
of
private
industrial effluent treatment plants should
be approved by the control
minimum qualification
that
should
be
established
authority and
requirements
for
pe op le
who
maintain and operate such plants.
THE WAY FORWARD :
PLANNING AG AINST WATER POLLUTION
3.27
All
new
typhoon shelters and
developments, such as recla ma tions,
marine outfalls, that could have a
significant effect on water flows or water quality, will be
tested using models for prediction purposes.
In many
cases, the water quality and hydraulic model WAHMO will be
used (see para. 3.14).
3.28
The success of the various measures taken to
quality of Hong Kong's inshore waters could be
under mi ned if pollution from neighbouring
protect the
seriously
territories is not kept in check. The flow from the Pearl
Hong Kong directly and water quality in Deep
River affects
Bay and Mirs
from Shenzhen.
Bay
can be affected adversely by discharges
CONFIDENTIAL