CONFIDENTIAL

28

is

to

no requirement in the Ordinance for existing dischargers

connect up to a sewer when one is newly provided and the

processing of notices and licence applications under the

Ordinance is ti me-consuming for EPD staff, there by redu cing

the manpower available for inspection and enforcement.

THE WAY FORWARD :

SEWERAGE AND SEWAGE DISPOSAL FACILITIES

3.19

When the

EP D was

sew age

depart ment

took

a

responsible for the

the

fundamental improvements

established in 1986, it be ca me

programme. At an early stage

number of steps to achieve

in the sew erage infrastructure.

The first was to initiate a series of studies reviewing the

adequacy of the sew erage in selected sew age catchment areas

and, based on the results of the review, to proceed to the

preparation of Sew erage Master Plans (SMP) for these areas

and the planning of any new sewer construction works that

are needed to rectify the problems. The aim of an SMP is

to get the sewage

and industrial effluents into the foul

system, rather than the storm-water drains, and to

ensure that the fou l s ewers are large enough to receive

these wastewaters.

sew erage

3.20

the

Study, was

The

The next step is to decide how best to dispose of

wastewaters that are collected by the sewerage system,

in a cost-effective and environmentally satisfactory way.

Accordingly, a further ma jor study, the Sewage Strategy

initiated by the EP D in early 1987.

objective of the Sewage Strategy Study is to review and

recommend water qulity objectives for the coastal waters of

Hong Kong, and to develop options to treat and dispose of

the sew age from existing developments and those planned for

the next decade under the SMP's. The possible options are

CON DENTAL

Share This Page