CONFIDENTIAL
10
-
1990
1991
1992
Kowloon Bay RTS
WENT landfill
Hong Kong Island East RTS
1993/4
NENT landfill
1995 onwards
SENT lan dfill
Hong Kong Island West RTS
Yuen Long/Tuen Mun RTS
Sha Tin RTS
Further RTS's at West Kowloon,
Tai Po and possibly a third
location on Hong Kong Island
2.16
the
The provision of the above facilities will permit
following existing facilities to be phased out, with
significant environmental gains:
1989
1990
Lai Chi Kok incinerator station B
(
Lai Chi Kok incinerator station A
(
Jordan Valley landfill
1992
(
Pillar Point landfill
(
Kennedy Town incinerator
1993/4
(
Shuen Wan lan df ill
(
Junk Bay Stage III
after 1995
Kwai Chung incinerator
Chemical Wastes
2.17
The
de mand
for
che mi ca l waste disposal
facilities, and the further demand that will result from
the enactment of effluent control legislation, will be met
in two ways. Most of the demand will be met by a Chemical
Waste Treatment Centre (CWTC) to be constructed at Tsing
Yi.
The remainder will be disposed of at the Junk Bay
landfills.
2.18
a
The CWTC will be designed, built and operated by
contract will include a
single
requirement
collect
contractor.
The
to operate a fleet of specialist vehicles to
such wastes as acids, alkalies, solvents, organic