CONFIDENTIAL

Para

Subject

(a)

(b)

Planning Information

(c)

Reference to Compendium (1)

(d)

13.

d.

Aviation Fuel Requirement

Estimated Total Uplift

(Cubic Metres)

Para 82

[Single spacing between airfields]

e.

Estimated Timings

11

Sea Evacuation

a.

(1) First evacuation aircraft arrives in

by H +

Para 10d. The uplift of aviation fuel from base, staging and reception airfields will be calculated by HQ 1 Gp (through HQ STC) after the scale of the evacuation airlift has been determined.

14.

Para 10e.

Paras 73-75

Airlift timings will be provided by HQ STC who will obtain the information from HQ STC and HQ 1 Gp.

hours.

(2) Evacuation of numbers shown at paragraph 8 is expected to take a further

hours using

Para 76

VC 10 and

Hercules aircraft.

Evacuation Ports

Para 55

(1)

(2)

b.

Evacuation Beaches

(1)

(2)

c. Reception Ports. To be decided at time of mounting.

Para 64

H-5

CONFIDENTIAL

15. Para 11. The availability of ports and beaches should be confirmed with DNOT. If any doubts exist over the state of facilities a check with the post in the country concerned, made through the FCO (Defence Dept), may provide up-to-date information. DNOT will also provide the times required for sub-para llc.