Para

(a)

Subject

(b)

9

Summary of Forces

Required

CONFIDENTIAL

Para 98. The likely availability of HM Ships can be obtained from MODUK (NAVY) (Directorate of Naval Operations and Trade (DNOT)).

8. Para 9b and c. The individual components of the force required will depend on the situation in the country being evacuated. These components, and their deployment locations, form part of the Joint Staff Table at Annex of the Part 2 plan.

Planning Information

(c)

4. Royal Navy. HM Ships, Royal Fleet Auxiliaries (RFA) and helicopters as available.

b. Army:

(1) Communication detachments as follows:

(a) Contingency Rear Link (Satellite)(CRL(S)) Detachment - UK/TSC_502.

(b) CXL(HF) detachment UK/TRC 521 or CRL(HF) Light (Lt) detachment UK/VRC 322.

(c) Vehicle Radio

A

Detachment (HF) (VRD(HF))- UK/VRC 321.

(d) VRD(HF) - UR/VRC 321

fitted BID/860.

(e) VRD(VHF)

fitted BID/250.

UK/VRC 353

(f) Two Manpack Radio Detachments (HF)(MRD(HF)) UK/PRC 320.

(g) Cryptographic Team.

(h) Communication Centre Detachment (COMMCEN Det).

(j) Force Signal Officer (FSO).

(2) On Call.

(a) Refugee Administration Package

(b) 640 Signal Troop (EW) (insert if required).

Reference to

Compendium (1) (d)

Paras 26-30

Paras 31-33

7.

Annex G

Para 42 and

83

Annex H

Paras 33

and 125

4-2

CONFIDENTIAL

Share This Page