CONFIDENTIAL

RAF AUGMENTATION PACKAGE FOR ASCENSION ISLAND PACKAGE GOLF

Reinforcements Required (1)(2)

Ser

No

Rank

(a) (b)

(c)

Branch/Trade

(d)

1

1

1

Wg Cdr/Sqn Ldr

GD

2

1

Wg Cdr/Sqn Ldr

Admin

3

1

Wg Cdr/Sqn Ldr

Eng (AS)

ENCLOSURE 1 TO APPENDIX 2 TO

ANNEX E TO

JTP 1

(9TH REVISE)

Post or Qualification

(0)

AT experienced. If Wg Cdr, he will command Ops Wg and replace present OC Ops Sqn who will become Sqn Ldr Ops. If Sqn Ldr, he will become Sqn Ldr Ops, subordinate to present OC Ops Sqn.

If Wg Cdr, he will command Admin Wg and replace present OC Admin Sqn who will remain as Sqn Ldr Admin. If Sqn Ldr, he will become deputy to OC Admin Sqn.

Source

(f)

To be nominated by HQ STC.

To be nominated by HQ STC.

If Wg Cdr, he will command Eng Wg and replace present OC Eng Sqn who will remain as Sqn Ldr Eng. If Sqn Ldr, he will become Sqn Ldr Eng, subordinate to present OC Eng Sqn.

To be nominated by HQ STC.

1

Wg Cdr/Sqn Ldr

GD

AAR Det Cdr (Ground Duties only)

5

1

Sqn Ldr

Supply (M)

OC Movs Flt

6

1

Flt Lt

Supply (M)

Movs Flt

7

1

Flt Lt

Eng (AS)

Eng Wg/Sqn

To be nominated by HQ 1 Gp.

Н

'Notes:

1. Selected serials are to be requested by CBFASI as required.

2.

Details take into account the existing ASI Hercules Eng Det and also assume that all VC10 aircraft would be supported by VC10 GEs.

E2-E1-1

CONFIDENTIAL

Share This Page