CONFIDENTIAL
ENCLOSURE 1 TO
APPENDIX 1 TO ANNEX E TO (JTP 1 ) (9TH REVISE)
OPERATIONS, ENGINEER AND ADMINISTRATIVE REINFORCEMENTS REQUIRED TO SUPPORT INCREASED ACTIVATION OF RAF AKROTIRI
1. Package ALFA. 24 hour operations for up to 3 days.
Serial No
Rank
(a)
(b)
(0)
Branch/Trade
(d).
A-1
1
CT/Sgt
A Tech A
A-2
1
Cp1/JT
A Tech A
A-3
1
CT/Sgt
A Tech P
A-4
1
Cp1/JT
A Tech P
A-5
1
Cp1/JT
A Tech P
A-6
1
Cp1
A Tech E
A-7
1
A-8
1
JT
85
Cp1
L Tech FS
MT Tech
A-9
1
SAC
MT Mech
A-10
1 Cp1
MTD
A-11
14
SAC
MTD
A-12
3
SAC
Supplier
Notes
(0)
A-AHER-ASS, X407
) To be provided ) by HQ 1 Gp, from
Q-AVC-ASS or X408 ) Mobile Servicing
Q-AHER-PSS, X407
) Section if
) possible.
) Serials A-1 to A-6
Q-AVC-PSS or X408 ) should contain
) approx 50% pers Q-AHER-PSS or X407 ) additionally
) qualified Q-AVC-ESS or X408 ) Q-D-B.
Q-AHER-NISS or X407
Q-MT-CS
Q-MT-H2 & Q-MT-CR
Q-MT-H2 & X727 (Refueller qualified)
Provided by TSW RAF Stafford.
RAF Akrotiri to provide in-situ
training on BFI operation on arrival.
A-13
2
LAC
Supplier
A-14
SAC
Supplier
A-15
2
Fit Lt
GD
Tpt ac and Ops Room experienced.
A-16
1
Cp1
AATC
A-17
SAC
AATC
Ops Room manning
Ops Room manning
E1-E1-1
CONFIDENTIAL