CONFIDENTIAL

ENCLOSURE 1 TO

APPENDIX 1 TO ANNEX E TO (JTP 1 ) (9TH REVISE)

OPERATIONS, ENGINEER AND ADMINISTRATIVE REINFORCEMENTS REQUIRED TO SUPPORT INCREASED ACTIVATION OF RAF AKROTIRI

1. Package ALFA. 24 hour operations for up to 3 days.

Serial No

Rank

(a)

(b)

(0)

Branch/Trade

(d).

A-1

1

CT/Sgt

A Tech A

A-2

1

Cp1/JT

A Tech A

A-3

1

CT/Sgt

A Tech P

A-4

1

Cp1/JT

A Tech P

A-5

1

Cp1/JT

A Tech P

A-6

1

Cp1

A Tech E

A-7

1

A-8

1

JT

85

Cp1

L Tech FS

MT Tech

A-9

1

SAC

MT Mech

A-10

1 Cp1

MTD

A-11

14

SAC

MTD

A-12

3

SAC

Supplier

Notes

(0)

A-AHER-ASS, X407

) To be provided ) by HQ 1 Gp, from

Q-AVC-ASS or X408 ) Mobile Servicing

Q-AHER-PSS, X407

) Section if

) possible.

) Serials A-1 to A-6

Q-AVC-PSS or X408 ) should contain

) approx 50% pers Q-AHER-PSS or X407 ) additionally

) qualified Q-AVC-ESS or X408 ) Q-D-B.

Q-AHER-NISS or X407

Q-MT-CS

Q-MT-H2 & Q-MT-CR

Q-MT-H2 & X727 (Refueller qualified)

Provided by TSW RAF Stafford.

RAF Akrotiri to provide in-situ

training on BFI operation on arrival.

A-13

2

LAC

Supplier

A-14

SAC

Supplier

A-15

2

Fit Lt

GD

Tpt ac and Ops Room experienced.

A-16

1

Cp1

AATC

A-17

SAC

AATC

Ops Room manning

Ops Room manning

E1-E1-1

CONFIDENTIAL

Share This Page