UPDATED (88 at Mar 89)
ANNEX FIL
D CTS STAFF(R)76/259/22/1 DATED MAR 89
POLICE EXPANSION PLAN IN RELATION TO GARRISON WITHDRAWAL PLAN
1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997
Ө
1ST AND 2ND PTU AID COS OPERATIONAL
[3RD AND 4TH PTU AID COS OPERATIONAL
LÁNO
POLICE OCCE—OZ
A
AIR
LOLCE GCRC-90%
2/7 GURKHA| BN
TAKE OVER HALF THEBORDER
TAKE OVER FULL BORDER | CONTROL
RISERVE BN IN IRUNEI )
5TH AND 6TH PTU AID COS
OPERATIONAL
WITHDRAY 1ST BN
·(APPROX 2ND BN)- -{FLEXIBLE)
3RD BN WITHDRAWAL SUBJECT TO PREVAILING CONDITIONS (NOTE1]
TH BN
•~•~•~• (RESERVE BN IN BRUNEI/HONG KONG)—.—_
1.
The Governor has stated he envisages a need for 2 resident battalions until the final handover date. EXCO has indicated this may be in Hong Kong's interests but will require further consideration.
SEA
POLICE MER-40%
OPTIONS ON 4 DAUPHIN REPLACEMENTS TO BE
EXERCISED BY 1992 IF REQUIRED
(TO ENSURE] 6 AVAILABLE FOR
8 SIMULTANEOUS HELILIFT of HALF
INF COL.
8
6 AE & 2 IUR
6 MONTH TRIAL 6 UE 6 2 IRR 6 UE/2 IRR
OR AUE FROM END 89
3 DAUPHIN REPLACEMENTS
3 DAUPHIN REPLACEMENTS
1 DAUPHIN REPLACEMENT
PROVIDE FULI, SUPPORT FOR
1 DAUPHIN REPLACEMENT.
HKP
(92/93 SIMULTANEUOS LIFT FOR ONE PLATOON)
? WESSEX
(NOTE 2)
? SCOUT
(NOTE 2)
2.
One platoon lift requires 4 Wessex. Garrison minimum LH support requirement is 4 Scouts, reducing to 3 once garrison reduces to a single UK battalion group.
Final AE/UE/IUR/IRR_ratios to be determined by study.
3.
2 Old Sector control LAUNCHES
RSRM
PEACOCK PÅTROL CRAFT
SECTOR CONTROL. LAUNCHES.
1 MODERN SECTOR CONTROL
LAUNCH
2 MODERN SECTOR CONTROL LAUNCHES
SMALL BOAT UNI (REPLACED RSRM
PEACOCK JATROL CRAFT
NOTE 31-
Disposal of PEACOCK PC and arrangements for future RN presence until final handover date to be determined by RN-led study.