13

SECRET UK EYES A

LOCSEN

REVIEWS

58. The COS are asked to endorse the proposal that the next

biennial review should be cancelled, and that the major 1992

review of the Hong Kong Garrison Withdrawal Plan should be advanced, and completed by the end of 1991 (6 months before the withdrawal of the first of the 4 remaining battalions).

59. The COS are asked to note that if at any time the

situation or threat changes in a manner that is likely to justify a review of the above decisions or planning they will be advised accordingly.

60. The COS are advised to take note that the contingency plan for the reinforcement of Hong Kong (JTP 30) will be

reviewed in March 1990.

STUDIES

61. The COS are invited to endorse the requirement for a DIS study of the factors likely to contribute to the outbreak of violence in Hong Kong, and of what, if any, additional collection and assessment capability will be required to monitor the threat in order to achieve timely warning. This study should be completed by 1 July 1991 - in time to form a basis for the major review proposed in paragraphs 42 and 43.

62. The COS are asked to note that the following studies have already been commissioned or refined as a result of this biennial review:

a.

Future RN Presence. A study, to be led by MOD Navy and completed by mid-1989, to determine the type(s) and number of vessels which could

COS49.6-17

36 LOCSEN

UK EYES A

SECRET

Redacted

under FOI exemption section 27(1)

Page 45Page 46

Share This Page