MAJOR REVIEW - TIMESCALE

SECRET UK EYES A LOCSEN

42. A major wide-ranging review of CDS 7/87 is currently scheduled to take

place in 1992. This timescale was originally selected because it falls 5 years

before the final withdrawal; it was recognised that 1991 would see the for-

mulation of crucial decisions relating to commercial re-investment in Hong Kong

- with implications for the security and stability of the Territory. Under

current arrangements the next biennial review of CDS 7/87 will be completed in

Feb 91, with the major review requested by the HKG being conducted by an unspe-

cified date the following year. However, this paper proposes that the first

battalion should cease operational service in mid 1992 and withdraw from Hong

Kong in the third quarter. This will be a crucial event and it is considered

advisable that the withdrawal decision, if announced in 1989, should be sche-

duled for final albeit entirely discreet

-

-

confirmatory clearance by the COS

by the end of 1991. With this objective in mind, it is proposed that the next

biennial review and the major review should be combined and conducted during the

second half of 1991. The review is likely to be complex, but it is considered

that by early Oct 1991 it will be possible to judge whether the Hong Kong Police

will be able to assume effective control of half of the border by the end of

that year. There should also be sufficient indication during 1991 of the

approach being adopted towards Hong Kong by financial investors. It is there-

fore suggested that the first draft of the major review, taking due account of

the threat study to be prepared by DIS, should be issued in early Oct 1991 -

with final clearance by the COS in committee before Christmas. This would per-

mit Ministerial confirmation of the Withdrawal Decision to be announced, if

necessary, some six months ahead of the actual withdrawal of the first bat-

talion.

ROW 113 (HONG)

26

SECRET UK EYES A LOCSEN

Share This Page