at Central

with

: direct

connection to the west

roads ON and off

slip

both

directions, serving Sheung kan and Central

with links to both the east and west;

at Exhibition, serving the new reclamation

and the existing Central cistrict with

connections to the east;

at Causeway Bay, serving the catchment areas

in Causeway Bay/Happy Valley and connecting

traffic from North Point to the west.

b) a mass transit line from Kowloon, cross-harbour into

the new reclamation then rumming east-west through the

reclamation with an interchange with the NIkt. Is land

Line, either at Fortress or lin liau.

3.8 A road grid is proposed for each of the development cells

serving local traffic and linked to а distributor roag

which runs the length of the reclamation.

3.9 Public transport networks for bus, PLL taxi and tram heve

been designed, with integrated transport interchanges.

Possibilities for mono rail or other "people nevers" have

also been allowed for,

5.10

A pedestrian network has been designed which allows as far

as possit le a segregated syster which links other transport

modes, development cells and open Spaces in a conventert

and attractive manner.

Provision has been Bedde for all required passenger ferry

roblus with.

links with development cells and

other transport #ades.

Page 15Page 16

Share This Page