Mr Haswell

W201 JerPaul, He.)

CONFIDENTIAL

FM HONG KONG

CONFIDENTIAL

This won't fully convurce the Treacy, though whi

heep a bil

What alone

Mr. STENG

de

2010

FILE

148

052505

MDADAN 9644

HKB

243 /11

the azument VANCE COPY

TO DESKBY 13100OZ FCO

TELNO 3416

anying will

OF 130915Z OCTOBER 89 Capable of aluna fur

YOUR TELNO 2067

143

ше

Справи of there is

new influx

azre

bose

fr

not

on

fill.

I Pls subst hat

this

one

for the

'Top rapy' on file.

VIETNAMESE BOAT PEOPLE: UK FINANCIAL ASSISTANCE

1. WE FULLY UNDERSTAND THE NEED TO PRESENT A SOUND CASE FOR FUNDING

OF THIS MAGNITUDE AND WE WILL BE PLEASED TO PROVIDE ANY ADDITIONAL

INFORMATION YOU REQUIRE.

(A) ALTERNATIVE MEASURES

2. THE ALTERNATIVES MENTIONED IN PARAGRAPH 6 OF OUR TELNO 2923 WERE

FOR THE FULL DEVELOPEMENT OF HIGH ISLAND AND SEK KONG. AT THAT TIME

BOTH PROJECTS WERE TO BE TEMPORARY TENTED CAMPS. OUR PLANNING FOR

HIGH ISLAND CHANGED DURING AUGUST AND THE CAMP WILL NOW BE A FULLY

DEVELOPED SCHEME USING ROMNEY TYPE BUILDINGS IMPORTED FROM HOLLAND.

THIS CHANGE IN DESIGN IS ONE OF THE REASONS FOR OUR REQUEST FOR FUNDS

TO ENABLE US TO COMPLETE OUR PRESENT BUILDING PROGRAMME.

3. ON SEK KONG, WE HAVE DECIDED AGAINST FULL SCALE DEVELOPMENT. THE

SITE IS ON LOW LYING GROUND WHICH IS PRONE TO FLOODING. IF WE WERE

TO CONSTRUCT A FULL SCALE CAMP USING PREFABRICATED BUILDINGS, OR ROMNEY HUTS IT WOULD BE NECESSARY TO UNDERTAKE EXPENSIVE SITE

PREPARATION WORKS. LOCAL OPPOSITION TO FULL SCALE DEVELOPMENT WOULD

BE INTENSE AND FINANCE COMMITTEE WOULD BE UNLIKELY TO PROVIDE

FUNDS. THERE IS ALSO OF COURSE THE QUESTION OF THE AIRSTRIP AT

SEK KONG. WE ARE ANXIOUS TO REINSTATE THE AIRSTRIP AS SOON AS

POSSIBLE AND THE FULL SCALE DEVELOPMENT OF THE CAMP WOULD MAKE THIS

IMPOSSIBLE.

4. IN PARAGRAPH 3 OF TUR YOU HAVE ASKED WHY THE TELEGRAPH BAY AND

SOUTH LANTAU SITES ARE ONLY MARGINALLY LESS EXPENSIVE TO DEVELOP THAN

TAI A CHAU. THE MAIN REASON IS THAT ALL THREE SITES WILL REQUIRE MAJOR INFRASTRUCTURE DEVELOPMENT. THE WATER SUPPLY, SEWAGE TREATMENT AND BUILDING DESIGN ARE ESSENTIALLY THE SAME FOR ALL THREE. SOUTH LANTAU AND TAI A CHAU ARE IN FACT VERY SIMILAR SITES AND THE SCALE

OF SITE PREPARATION WORKS IS VERY SIMILAR. TELEGRAPH BAY IS A FLAT

SITE BUT IT IS A RECENT RECLAMATION. WE MUST THEREFORE BUILD ON THE

BASIS OF A LOW DENSITY WHICH MEANS THAT A LARGE AREA MUST BE

PREPARED AND CONCRETED. IT WILL ALSO BE NECESSARY TO CONSTRUCT A

PAGE

1

CONFIDENTIAL

23/10

Share This Page