4. COMPARISON TABLE
Komney Huts Vs
T
MY
Construction
Fire hazard
1
Prefabricated Buildings
Description
Romney Wate
(single storevi
!
་
Buildings
(3 storevs)
| Corrugated metal
I sheets on metal
i structural
frame.
Susceptible to I fire damage
Exposed metal frames
1
4 months.
Cement board
| panels on metal
structural frame.
| Less suscepliable.
All structural metals are protected.
5 months,
Erection time for buildings
| (excluding infra-structure &
1 geotechnical works)
| Construction time for infra-structure & .
geotechnical works
t
Demountability
6 months.
Wider spread-out
of buildings.
1 50%
| None
Ceiling
| None
! Heat Insulation Wall
Quality Control
| Appearance
| Cost for Building Supply
| Cost for Geotechnical Works,
site tormation
Comp Management
| Good
{
! Interior
Į
| $24.00m
$60.00m
Difficult
i wide-spread
| building layout.
i
4 months.
More concentrated
layout.
80%
i Good
| Good
| Good
Superior
Į $70.70m
$15.00m
!
Basier management.
ADAABA
/P. 5
!
1
:
Page 120Page 121