ROUSH INDICATION OF COSTS
Stage 1
Stage 2
Stage 3 Stage 4
TOTAL
($a }
( 1m)
($m)
($m)
(A) Suply and erection af Prefab buildings
27.60
25.10
27.60
24,60
104.90
(3) Builders work in concrete foundations,
Drainage, washing areas, toileta, water storage tanks, plumbing, transformer house
25.20
20.20
21.00
20.30
86.70
(C) Electrical installations, perimeter lighting, fire fighting by stam, water pumps, LPC storage
(D) Site formation works
24.70
20.00
20.90
18.90
84.50
3.40
2.90
3.10
2.80
12.20
(E) Security fencing (5.2m high) double
9.60
()ster Supply
(G) Sewage Disposal
(H) Mains electricity supply
(1) Access roadworks
(J) Contingency
ADAABC
3.00
20.00
5.00
9.40
7.20
7.50
35.70
5.00
20.00
5.00
9.00
7.00
7.00
6.00
29.00
$127.50
$84.60
$80.80
$80.10 $3.9.00
Average Cost per head = $13,732