1989-10-24 09:18 SECURITY BRANCH

852 5 868 5074 P.06

2.

ROUSH INDICATION OF COSTS

Stage 1

Stage 2

Stage 3 Stage 4

TOTAL

($a }

( 1m)

($m)

($m)

(A) Suply and erection af Prefab buildings

27.60

25.10

27.60

24,60

104.90

(3) Builders work in concrete foundations,

Drainage, washing areas, toileta, water storage tanks, plumbing, transformer house

25.20

20.20

21.00

20.30

86.70

(C) Electrical installations, perimeter lighting, fire fighting by stam, water pumps, LPC storage

(D) Site formation works

24.70

20.00

20.90

18.90

84.50

3.40

2.90

3.10

2.80

12.20

(E) Security fencing (5.2m high) double

9.60

()ster Supply

(G) Sewage Disposal

(H) Mains electricity supply

(1) Access roadworks

(J) Contingency

ADAABC

3.00

20.00

5.00

9.40

7.20

7.50

35.70

5.00

20.00

5.00

9.00

7.00

7.00

6.00

29.00

$127.50

$84.60

$80.80

$80.10 $3.9.00

Average Cost per head = $13,732