4. COMPARISON TABLE
Romney Huls Vs Prefabricated Buildings
-
1
:
1
Construction
1
Fire hazard
Description
(single storey)
า
Buildings
(3 storevs)
! Corrugated metal
| sheets on metal
¦ structural
frame.
1
Susceptible to ¡ fire damage
Exposed metal
1 frames
Cement board
| panels on metal
i structural frame.
Less suscepliable. All structural
metals are
protected.
| Erection time for buildings
(excluding infra-structure &
geotechnical works)
Construction time for infra-structure &
! geotechnical works
4 months.
| 5 months,
1
1
6 months.
| Wider spread-out
of buildings.
| 50%
I
Demountability
Heat Insulation
Wall Ceiling
I None
i Quality Control
! Appearance
| Cost for Building Supply
| Cost for Geotechnical Works,
| site formation
Comp Management
| None
| Good
!
! Interior
| $24.00m
$60.00m
-
4 months.
More concentrated
¡ layout.
80%
i Good
| Good
| Good
事
Superior
$70.70m
$15.00m
Wi:ficult
wide-spread
building layout.
hasier management.
ADAABA
/P. 5